PRODUCTION PROCESS OF 60 FT UGL ROLLERS ON FLAT TOP (CFT) WAGON CONTAINER TYPE TRAINS AT PT. INDUSTRIAL TRAIN

Authors

  • Abdul Rahman Agung Ramadhan Gunadarma University
  • Eko Aprianto Nugroho Gunadarma University

DOI:

https://doi.org/10.56127/ijst.v2i3.1076

Keywords:

Containers, Production, Train

Abstract

A train is a form of rail transportation consisting of a series of vehicles pulled along a railroad track to transport cargo or passengers. There are different types of trains designed for specific purposes. A train may consist of a combination of one or more locomotives and attached railcars, or several self-propelled units (or sometimes a single or articulated powered coach, called a railcar). To move the train, a component called a bogie is needed. Bogies are generally used for wheels with more than 2 axles (As) in one train car. One of the bogie components found on a train is a bolster. The function of the bolster is to support the bogie against the train body. In making UGL 60 FT bolsters, it begins with material preparation. The materials used are S690Q steel with a tensile strength of 690 MPa, S355J2+N steel with a tensile strength of 355 MPa and E235 steel pipe with a tensile strength of 235 MPa. After that, it enters the cutting process, namely the process of cutting plate-shaped material using a plasma cutting machine and cutting steel pipes with a bandsaw machine, then the chamfering process, which is the process of cutting corners to form a chamfer with an angle of 0 - 90 degrees, after that the Bending process, namely the process of bending on one of the bolster components, then the assembly process, namely the process of connecting a single part of the bolster and continuing the welding process using a 350 ampere GMAW welding machine, and the last is the Quality Control (QC) process, namely the material testing process using the Non Destructive Test (NDT) method. in the form of Magnetic Test (MT) and Visual Test (VT) testing. Quality Control (QC) is carried out to check the feasibility of an object being produced. If there is a workpiece that is not good then the workpiece will be repaired again. And if the workpiece is said to be feasible, it will be brought to the assembly process in the assembly division.

References

PT. INKA. (2015). Berita. “Mengenal Istilah Bogie Pada Kereta Api (Bag. 1). https://www.inka.co.id/berita/58. Diakses pada 27 September 2022.

PT. INKA. (2015). Berita. “Mengenal Istilah Bogie Pada Kereta Api (Bag. 2). https://www.inka.co.id/berita/533. Diakses pada 27 September 2022.

PT.INKA (2017).“TENTANGINKA”. https://www.inka.co.id/corporation/7. Diakses pada 23 mei 2023.

Kusuma, I. C (2020). “Faktor Yang Mempengaruhi Volume Produksi Pada PT. Yongjin Javasuka Garment Fact 1”. Diakses pada 28 Mei 2023.

Permana, Pegi. (2020). “Perencanaan Raw Material Pada Proyek Kereta Ukur Myc”. Madiun. Universitas Muhammadiyah Yogyakarta.

Teknik Mesin Lanjut.(2021). Modul Praktikum Material Teknik. Universitas Gunadarma.

UnionStahl. (2021). Structural steel S355J2+N according to DIN EN 10025-2. Diakses pada 28 Mei 2023.

GNEE (Tianjin) Co, Ltd. (2023). Cold Finished EN 10305 E235 Precision Seamless Steel Tube. Diakses pada 28 Mei 2023.

Akhmad, Al A (2009). "Pemesinan Nonkonvensional Plasma Arc Cutting". Diakses pada 22 Juni 2023.

Arifin Zhaenal (2018). “Pengaruh Variasi Cutting Speed Terhadap Kekasaran Permukaan SUS 304 Pada Proses Laser Cutting Menggunakan Gas N2”. Skripsi Teknik Mesin Konsentrasi Teknik Manufaktur. Universitas Brawijaya. Diakses pada 22 Juni 2023

Downloads

Published

2023-11-30

How to Cite

Abdul Rahman Agung Ramadhan, & Nugroho, E. A. (2023). PRODUCTION PROCESS OF 60 FT UGL ROLLERS ON FLAT TOP (CFT) WAGON CONTAINER TYPE TRAINS AT PT. INDUSTRIAL TRAIN. International Journal Science and Technology, 2(3), 57–63. https://doi.org/10.56127/ijst.v2i3.1076

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.