REINFORCEMENT NEEDS FOR THE FOUNDATION OF A MULTI-STOREY BUILDING Y – NORTH JAKARTA
DOI:
https://doi.org/10.56127/ijst.v3i3.2212Keywords:
Reinforcement, structural elements, multi-storey buildingsAbstract
The North Jakarta XYZ Building Construction Project consists of two stages of construction. The first phase of construction began on August 17, 2020 and was completed on August 17, 2021, while the second phase is currently under construction. The building structure consists of two towers with a total of 107 residential units for households. Construction work on this project includes preparatory work such as marking work, foundation work, substructure work such as pile drive, and superstructure work such as pillar work and curtain installation. The method of calculating rebar reinforcement using the Bar Bending Schedule (BBS) includes several steps to calculate the working volume, calculate reinforcement needs, calculate waste and calculate rebar weight. Based on the results of the analysis, it can be obtained that the main rebar requirement for D19 is 676.7 kg or 36.8% of the rebar requirement. End Spiral + Joint Reinforcement, D13 is 908.54 Kg or 48.98% of the rebar requirement. Middle Spiral Rebar + Joint, D10 amounted to 269.51 Kg or 14.53% of rebar requirements. Rebar waste, namely D19 Main Reinforcement, contains 178.08 kg of waste or 26.31% of rebar needs. Rebar waste, namely Spiral End Reinforcement + Joint, D13 contains 27.46 kg of waste or 12.63% of rebar needs. Rebar waste, namely Spiral End Reinforcement + Joint, D13, contains 11.85 kg of waste or 5.44% of rebar needs. The amount of cost needed for strengthening needs is Rp. 30,603,434.
References
Ajiono Rekso, Ridwan Ahmad.2017. Pengendalian biaya dan jadual terpadu pada proyek konstruksi. Universitas Kadiri. Kediri Jawa Timur.
Akhirudin Fajarsyah Ahmad. 2018. Percepatan Waktu Pengerjaan Proyek Konstruksi Dengan Menggunakan Metode Fast Track . Jurnal Teknik Sipil XIII UNJ. Jakarta.
Jonanda Novelia.2019. Analisis durasi dan baya pembangunan gedung menggunakan metode fast track, studi kasus gedung loka kesehatan masyarakat palembang. Universitas Sriwijaya. Palembang.
Ketut Dewa Sudarsana. 2008. Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi. Jurnal Ilmiah teknik Sipil Universitas Udayana. Bali.
Mantulamen B Pascal , dan Watofa Elvira. 2018. Analisa waktu dan biaya menggunakan metode fast track pada pelaksanaan proyek konstruksi, studi kasus pembangunan ruang poliklinik rumah sakit kab.punjak jaya. Jayapura. Universitas Sains dan Teknologi.Jayapura Papua.
Mesias A.Y, Lona Paula H.L, Sina T. A. Dantje. 2013. Pengendalian Waktu Dan Biaya Pekerjaan Konstruksi Sebagai Dampak Dari Perubahan Desain. Jurnal Teknik Sipi Vol. II No 2 Universitas Nusa Cendana. Kupang Nusa tenggara Timur.
Rahayu Puji Aryati, Mulyani Endang, Arpan Budiman. 2018. Analisa Percepatan Waktu Dengan Metode Fast Track Pada Proyek Konstruksi . Kalimantan Barat. Universitas Tanjung Pura. Pontianak Kalimantan Barat.
Rahman Aulia N.A. 2018. Percepatan waktu terhadap biaya menggunakan metode fast track pada pelaksanaan proyek jember town square. Jember: Universitas Jember. Jember Jawa Timur.
Sari Novita. 2019. Analisis Pengendalian Waktu Selesai Proyek Dengan Menggunakan Metode Fast Track (Studi Kasus : Pembangunan Masjid Pemkab Deli Serdang). Universitas Sumatera Utara. Medan.
Satria Yanuar Dwi. 2016. Analisis Risiko Biaya Dan Kualitas Akibat Metode Fast Track Pada Pengembang Perumahan Taman Anggun Sejahtera 5. Institut Teknologi Sepuluh Nopermber. Surabaya Jawa Timur
Stefanus Yohanes, Wijatmoko Indradi, Suryo Andi Eko. 2017. Analisis Percepatan Waktu Penyelesaian Proyek Menggunakan Metode Fast Track dan Crash Program. Universitas Brawijaya. Malang Jawa TImur.
Tjaturono, Mochtar B Indrasurya. 2008. Pengembangan Metode FastTrack Untuk Mereduksi Waktu Dan Biaya Pelaksanaan Proyek Studi Kasus Rumah Menengah Di Malang. Media Komunikasi Teknik Sipil. Malang Jawa Timur.
Warsika Darma P. 2016. Analisa Biaya dan Waktu Dengan Metode Fast Track Pada Pelaksanaan Proyek Konstruksi, Studi Kasus Proyek Pembangunan Gedung di Kabupaten Badung. Fakultas Teknik Universitas Udayana. Bali.
Wijanarko Bambang, Oetomo Wateno. 2018. Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan. Universitas 17 Agustus 1945. Surabaya Jawa Timur.
Satria Yanuar Dwi. 2016. Analisis Risiko Biaya Dan Kualitas Akibat Metode Fast Track Pada Pengembang Perumahan Taman Anggun Sejahtera 5. Institut Teknologi Sepuluh Nopermber. Surabaya Jawa Timur
Stefanus Yohanes, Wijatmoko Indradi, Suryo Andi Eko. 2017. Analisis Percepatan Waktu Penyelesaian Proyek Menggunakan Metode Fast Track dan Crash Program. Universitas Brawijaya. Malang Jawa TImur.
Tjaturono, Mochtar B Indrasurya. 2008. Pengembangan Metode FastTrack Untuk Mereduksi Waktu Dan Biaya Pelaksanaan Proyek Studi Kasus Rumah Menengah Di Malang. Media Komunikasi Teknik Sipil. Malang Jawa Timur.
Warsika Darma P. 2016. Analisa Biaya dan Waktu Dengan Metode Fast Track Pada Pelaksanaan Proyek Konstruksi, Studi Kasus Proyek Pembangunan Gedung di Kabupaten Badung. Fakultas Teknik Universitas Udayana. Bali.
Wijanarko Bambang, Oetomo Wateno. 2018. Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan. Universitas 17 Agustus 1945. Surabaya Jawa Timur.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Era Agita Kabdiyono, Alizar Alizar, Andy Maulana, Merdy Evalina Silaban

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.