[1]
Pramadha, I.Y. et al. 2024. TIME AND COST ANALYSIS OF DHOHO KEDIRI AIRPORT ACCESS ROAD PROJECT USING EARNED VALUE METHOD. International Journal Science and Technology. 3, 1 (Mar. 2024), 51–55. DOI:https://doi.org/10.56127/ijst.v3i1.1229.