[1]
Ali, M.K.K. et al. 2024. STRATEGIC OVERTIME IMPLEMENTATION: ASSESSING CRASH TIME, CRASH COST, AND COST SLOPE IN THE CONSTRUCTION OF KADIRI UNIVERSITY’S 4-STORY BUILDING . International Journal Science and Technology. 3, 2 (Jul. 2024), 41–47. DOI:https://doi.org/10.56127/ijst.v3i2.1309.