[1]
Almi, H. et al. 2024. ANALYSIS OF COST AND TIME PERFORMANCE ON THE EAST SURABAYA HOSPITAL CONSTRUCTION PROJECT USING THE EARNED VALUE METHOD. International Journal Science and Technology. 3, 2 (Jul. 2024), 1–11. DOI:https://doi.org/10.56127/ijst.v3i2.1482.