Almi, H., Hanie Teki Tjendani, & Budi Witjaksana. (2024). ANALYSIS OF COST AND TIME PERFORMANCE ON THE EAST SURABAYA HOSPITAL CONSTRUCTION PROJECT USING THE EARNED VALUE METHOD. International Journal Science and Technology, 3(2), 1–11. https://doi.org/10.56127/ijst.v3i2.1482