Evaluasi Volume Pasangan Dinding Menggunakan Clash Detection Pada Proyek Hotel Marriot Gelora

Authors

  • Era Agita Kabdiyono Universitas Dian Nusantara
  • Rosario Olsen Dian Nusantara University

DOI:

https://doi.org/10.56127/jts.v4i2.2299

Keywords:

Building Information Modeling, clash detection

Abstract

The development of digital technology has a positive impact on the construction  world, which plays an important role in economic growth and employment. The complexity  of construction work requires good project management and coordination to simplify and  minimize errors in the construction and supervision process. One technology that can be  implemented in construction work is Building Information Modeling (BIM). This study uses  a quantitative method using BIM software, namely Autodesk Revit for 3D modeling and  Autodesk Navisworks for analyzing collisions (clash detection). Data collection techniques  are carried out by receiving detailed engineering drawing (DED) data from consultants,  3D model structures, architecture and a recapitulation of project cost estimates. The use  of BIM in the Marriot Gelora Jakarta hotel project specifically to emit basement wall  volumes uses the clash detection method found in Autodesk Navisworks software. Clash  detection analysis is only carried out on the basement floor (B4 - B1M). A clash case is  created related to the volume of the basement architectural wall. Based on the results of  the calculation of the budget plan for the basement floor architectural wall work before  and after clash detection, it can be concluded that the use of BIM clash detection  technology can save budget costs of Rp. 82,191,346.13.

References

Permana, H., & Saputra, R. A. (2025). PENERAPAN BUILDING INFORMATION MODELING (BIM) DALAM ESTIMASI QUANTITY TAKE OFF MATERIAL PEKERJAAN STRUKTURAL PADA PEMBANGUNAN GEDUNG KONDOMINIUM HOTEL 8 LANTAI. Cerdika: Jurnal Ilmiah Indonesia, 5(2).

Savitri, D. M., Juliastuti, & Pramudya, A. A. (2020). Clash detection analysis with BIM based software on midrise building construction project. IOP Conference Series: Earth and Environmental Science, 426(1). https://doi.org/10.1088/1755- 1315/426/1/012002.

Izzudin, A., & Widiasanti, I. (2024). Pengaruh Clash Detection Pada Proses Perencanaan Biaya Pada Laboratorium PUT. Jurnal Talenta Sipil, 7(1). https://doi.org/10.33087/talentasipil.v7i1.466.

Ramadhani Rifqi, M. , Wahiddin, & Deni Putra, A. (2022). Analisis Clash Detection Dan Quantity Take Off Berbasis Building Information Modelling (Bim) Pada Perencanaan Ulang Struktur Atas Gedung Laboratorium Dan Bengkel Teknik Elektronika. Jurnal Online Skripsi, 3(3).

Elyano, M. R., & Yuliastuti. (2021). Analysis of clash detection and quantity take-off using BIM for warehouse construction. IOP Conference Series: Earth and Environmental Science, 794(1). https://doi.org/10.1088/1755-1315/794/1/012012.

Pemerintah Republik Indonesia. 2021. Peraturan Menteri PUPR Nomor 9 tentang Pedoman Penyelenggaraan Konstruksi Berkelanjutan.

Pemerintah Republik Indonesia. 2022. Peraturan Menteri PUPR Nomor 1 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat.

Grace Ellis. 2023. BIM Clash Detection: A Quick Guide. Internet: https://www.autodesk.com/blogs/construction/bim-clash-detection/. Diakses pada Juli 2025.

James Ocean. 2024. What is a Clash Detection Matrix? BIM Clash Matrix. Internet: https://revizto.com/en/what-is-clash-detection-matrix/. Diakses pada Juli 2025. Nirav Shah. 2025. Clash Detection in BIM- Process, Benefits and Future Scope. Internet: https://www.united-bim.com/what-is-clash-detection-in-bim-process-benefits-and future-scope-in-modern-day-aec-industry/. Diakses pada Juli 2025.

Downloads

Published

2025-08-30

How to Cite

Agita Kabdiyono, E., & Rosario Olsen. (2025). Evaluasi Volume Pasangan Dinding Menggunakan Clash Detection Pada Proyek Hotel Marriot Gelora. Jurnal Teknik Dan Science, 4(2), 165–174. https://doi.org/10.56127/jts.v4i2.2299