[1]
Kusworo, A.F.A. and Rifaldi Adi Saputra 2026. Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate. Jurnal Teknik dan Science. 5, 1 (Feb. 2026), 98–109. DOI:https://doi.org/10.56127/jts.v5i1.2655.