Ibnu Fadillah and Rifaldi Adi Saputra (2025) “Analysis of the Accelerated Implementation of the North Boulevard Paramount Petals Road and Canal Project Using CPM, PERT And Time Cost Trade Off Integration Methods”, Jurnal Teknik dan Science, 4(3), pp. 01–07. doi: 10.56127/jts.v4i3.2301.