[1]
Setiyowati, R. and Jalaludin, J. 2026. Time and Cost Performance Evaluation Using Earned Value Management in Residential Construction Projects: A Case Study of the Hanglekir Housing Development. Jurnal Ilmiah Teknik. 5, 1 (Feb. 2026), 306–324. DOI:https://doi.org/10.56127/juit.v5i1.1411.