Setiyowati, R., & Jalaludin, J. (2026). Time and Cost Performance Evaluation Using Earned Value Management in Residential Construction Projects: A Case Study of the Hanglekir Housing Development. Jurnal Ilmiah Teknik, 5(1), 306–324. https://doi.org/10.56127/juit.v5i1.1411