Setiyowati, R. and Jalaludin, J. (2026) “Time and Cost Performance Evaluation Using Earned Value Management in Residential Construction Projects: A Case Study of the Hanglekir Housing Development”, Jurnal Ilmiah Teknik, 5(1), pp. 306–324. doi: 10.56127/juit.v5i1.1411.