[1]
Putri, Y.K. et al. 2026. Accuracy Testing of Three-Phase kWh Meters in Direct and Indirect Measurement APP Wiring. Jurnal Ilmiah Multidisiplin. 5, 01 (Jan. 2026), 106–113. DOI:https://doi.org/10.56127/jukim.v5i01.2551.