Formwork Implementation Methods for Reinforced Concrete Column Structures Using PERI System

Authors

  • Reynold Andika Pratama Dian Nusantara University
  • Marysca Shintya Dewi Dian Nusantara University
  • Wildan Abdul Jabar Dian Nusantara University
  • Aryo Bismoko Dian Nusantara University

DOI:

https://doi.org/10.56127/ijml.v4i2.2226

Keywords:

PERI formwork system, reinforced concrete columns, formwork implementation, construction efficiency, quality control, modular formwork, KAI CO-Living Gondangdia, concrete surface quality

Abstract

This study investigates the implementation methods of the PERI formwork system for reinforced concrete column structures in the KAI CO-Living Gondangdia project, an 8-story residential building in Central Jakarta. Employing a qualitative case study approach, the research documents the assembly, installation, concrete placement, and removal processes of the PERI system during a three-month internship. Key aspects analyzed include material preparation, panel assembly, alignment techniques, quality control measures, and safety protocols. The PERI system, characterized by modular steel-framed panels and phenolic-coated plywood, facilitated rapid assembly (45-60 minutes per column), high dimensional accuracy (±3mm tolerance), and excellent concrete surface quality for 85% of columns. The system’s reusability (24 cycles) and reduced labor requirements (25% less than traditional methods) enhanced project efficiency. Standardized procedures, skilled labor, and rigorous quality control were critical to success, though specialized training was necessary. The findings highlight the PERI system’s advantages in speed, quality, and cost-effectiveness for repetitive structural elements, offering practical insights for optimizing formwork in modern construction. Recommendations include investing in crew training, detailed planning, and comprehensive quality protocols to maximize system benefits. 

References

Hadipriono, F. C., & Wang, H. K. (1986). Analysis of causes of formwork failures in concrete structures. Journal of Construction Engineering and Management, 112(1), 112-121.

Hallowell, M. R., & Gambatese, J. A. (2009). Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), 990-998.

Hanna, A. S. (1999). Concrete formwork systems. Marcel Dekker, New York.

Jarkas, A. M. (2010). The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), 527-543.

Jarkas, A. M. (2012). Analysis and measurement of buildability factors affecting edge formwork labour productivity. Journal of Engineering Science and Technology Review, 5(1), 7-14.

Kim, J. H., Robertson, R. E., & Naaman, A. E. (2012). Structure and properties of poly(vinyl alcohol)-modified mortar and concrete. Cement and Concrete Research, 29(3), 407-415.

PERI GmbH. (2018). TRIO column formwork technical documentation. Weissenhorn, Germany.

Tam, C. M., Tong, T. K. L., Lau, T. C. T., & Chan, K. K. (2005). Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), 245-254.

Downloads

Published

2025-08-02