Time Management Analysis on the Terban Market Renovation Project in Yogyakarta
DOI:
https://doi.org/10.56127/ijml.v4i3.2293Keywords:
Terban Market, Time Management, Network Diagram, Construction Project, efficiency, effectiveness.Abstract
The construction of the Terban Market in Yogyakarta requires time management that not only sharpens priorities but also enhances the efficiency and effectiveness of project execution. This study aims to analyze the application of time management in the Terban Market construction project, with a focus on improving prioritization, efficiency, and effectiveness. The research method used is Earned Value Analysis (EVA) to evaluate project performance in terms of time and cost. Data were obtained through field observations and interviews as primary data, and project documents such as the S-Curve and Budget Plan (RAB) from the contractor as secondary data. The analysis results indicate that time management implementation still requires improvement, particularly in on-site execution, with several weaknesses identified during project implementation.
References
Lagonda, Agnes Therse. (2021). Analysis of the Influence of Customer Satisfaction on Customer Loyalty. Jakarta: Media Ilmiah Nusantara.
Siswanto, Agus B. & Salim, M. Afif. (2020). Project and Construction Management. Surabaya: Graha Teknik.
Mardiaman, Dr. (2022). Infrastructure Investment Feasibility Study. Bandung: Citra Pustaka.
Hosaini, Hartoto, Alfiana, Sitindaon, Charles Darwin, Saptaria, Lina, & Rudi. (2021). Evaluation of Urban Infrastructure Performance. Jakarta: Mitra Cendekia.
Husen, Ibrar. (2010). Fundamentals of Educational Research. Yogyakarta: Andi.
Atmaja, Jajang, Wijaya, Yan Parta, & Hartati. (2016). The Influence of Public Policy Implementation on Public Services. Bandung: Pustaka Bangsa.
Sirait, Joel. (2022). Digital Marketing Strategy in the Era of Industry 4.0. Jakarta: Literasi Digital Press.
Runtuwarouw, Jufreni Gustien. (2020). Sustainable Transportation Infrastructure Management. Makassar: Penerbit Celebes.
Priyo, Mandiyo & Zhafira, Talitha. (2017). Construction Project Risk Management in Indonesia. Semarang: Konstruksi Prima.
Messah, Yunita Afliana, et al. (2013). Analysis of Employee Performance in Public Organizations. Denpasar: Widya Pustaka.
Rani, I. (2014). Time Management in Construction Projects. Jakarta: Pustaka Teknik.
Saputri, E. A., et al. (2021). Public Service Quality in the Public Transportation Sector. Malang: Aksara Publika.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Panca setiawan, Alizar Alizar

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.