Earned Value Analysis on the Tayan Bulking Station Project in East Kalimantan

Authors

  • Yohanes Godman Ora Etlatius Woda Sidi 17 Agustus University
  • Masca Triana 17 August University

DOI:

https://doi.org/10.56127/ijst.v4i3.2377

Keywords:

Earned Value Analysis (EVA), Cost Performance, Schedule Performance, Estimate at Completion (EAC), Construction Project Management

Abstract

This study aims to analyze the cost and schedule performance and to estimate the final cost and completion time of the Tayan Bulking Station Project in West Kalimantan. The method used is Earned Value Analysis (EVA) by analyzing three main parameters: Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), and Actual Cost of Work Performed (ACWP). Secondary data was obtained from PT. Sarana Remaja Mandiri, including the budget plan, S-curves, and weekly progress reports up to the 23rd week. The analysis continued by calculating variances (SV, CV), performance indices (SPI, CPI), and final estimates (EAC, ETC, ETS, EAS). The results indicate that the project's cost performance fluctuated. In the early project stages (weeks 1-9), there was a cost overrun (CPI < 1). However, in the subsequent period (weeks 10-23), cost performance improved significantly with cost efficiency (CPI > 1, reaching 2.35). Overall, the estimated final cost (EAC) is IDR 34.99 billion, which aligns with the initial budget (BAC). On the other hand, schedule performance tended to be delayed (SPI < 1) for most of the observation periods (weeks 1-14 & 18-23), although there was acceleration in weeks 15-17. The estimated project completion time (EAS) is 35 weeks, indicating a 1-week delay from the planned schedule of 34 weeks. The Earned Value method proved effective in identifying project performance. It is concluded that the Tayan Bulking Station Project is efficient in terms of cost but inefficient in terms of time, with a final delay of one week. This study recommends a greater focus on schedule control and improvement for this project and similar future projects.

References

Adhicandra, I., 2023. Project Management: Theory and Its Application. Sepriano ed. Jambi: Sonpedia Publishing Indonesia.

Al, M. E., 2024. Time and Cost Control of Pile Cap Work Implementation in the Z Hospital Construction Project in Jakarta Using the Earned Value Method. repository.pnj.ac.id

Al, Y. E., 2022. Literature Study. Scientific Journal of PGSD FKIP Universitas Mandiri, Volume 9, pp. 2477–5673.

Aziz, A., 2022. Project Management. Bandung: Widia Publisher.

Ervianto, W. I., 2023. Construction Management. Yogyakarta: CV Andi Offset.

Hidayat, A., 2021. Analysis of Time Management Implementation in the Bearing Project. Journal of Civil Engineering Research and Studies, Volume 7, pp. 27–28.

Isnain Zulkarnaen, S. M., 2023. Project Management (Theory and Its Implementation). Jambi: PT Sonpedia Publishing Indonesia.

Lengkong, S. C., 2021. Analysis of Project Cost Planning and Control at PT Marga Dwitaguna. EMBA Journal, Volume 9(3), pp. 1069–1076.

Nugroho, A. S. B., 2025. Construction Management: Project Case-Based Learning. Sleman, Yogyakarta: Gadjah Mada University Press.

Sari, H. M., 2021. Earned Value Analysis of the BPN Office Archives Building Construction Project. Transukma, Volume 03.

Satrio, N. B., 2020. Time and Cost Evaluation Using the Earned Value Method in the Sail Bridge Widening Project on the Pekanbaru Road Segment. Riau University Library.

Siswanto, A., 2020. Project Management. Semarang, Central Java: CV Pilar Nusantara.

Styaningrum, N. K. D., 2022. Time and Labor Control Plan in the Ayana North Wing Project Construction Using the Resource Leveling Method. repository.pnb.ac.id.

Swawikanti, K., 2025. Understanding Management. Brain Academy.

Wahyuni, E., 2020. Performance Analysis of Project “Y”. Journal of Applied Business Administration, Volume 2, pp. 60–78.

Yunus, A. I., 2023. Construction Management. Padang, West Sumatra: CV Gita Lentera.

Yunus, A. I., 2024. Project Management. Padang, West Sumatra: Gita Lentera.

Downloads

Published

2025-12-05

How to Cite

Yohanes Godman Ora Etlatius Woda Sidi, & Triana, M. (2025). Earned Value Analysis on the Tayan Bulking Station Project in East Kalimantan. International Journal Science and Technology, 4(3), 42–58. https://doi.org/10.56127/ijst.v4i3.2377