Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate
DOI:
https://doi.org/10.56127/jts.v5i1.2655Keywords:
Project Scheduling, Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), Construction Project Management, Time Scheduling Analysis, Shophouse Construction Project, Cimanggis Golf EstateAbstract
The construction project of Ruko Sapphire – Cimanggis Golf Estate experienced several delays, resulting in discrepancies between the planned schedule outlined in the S-Curve and the actual conditions in the field. These delays were caused by technical issues with the reinforcement fabrication machine, inconsistencies between structural and architectural stair drawings, rescheduling of concrete casting due to weather and the availability of a concrete pump truck. This study aims to analyze the project scheduling using two methods: the Critical Path Method (CPM), to identify the critical path and determine the minimum project duration, and the Program Evaluation and Review Technique (PERT), to estimate optimistic, most likely, and pessimistic time durations as well as the probability of completing the project on schedule. The research was conducted using a descriptive quantitative approach with primary data (observations and interviews) and secondary data (S-Curve). The results show that both CPM and PERT provide consistent, realistic, and accurate duration estimates, helping contractors identify critical activities, reduce the risk of delays, and provide a more reliable basis for project time planning.
References
Ahmad Ridwan, Universitas Islam Lamongan (2025), Optimalisasi Manajemen Waktu Proyek Menggunakan Metode CPM dan PERT
Christy N. V. Langkun, Jantje B. Mangare, Jermias Tjakra, Universitas Sam Ratulangi Manado (2025), Penjadwalan waktu proyek pembangunan puskesmas kakaskasen, tomohon dengan menggunakan metode PERT
Sidharta Kamarwan, (1998), Ilmu Manajemen Konstruksi
DM Sari, HR Agustappraja, S Arif (2025), Biaya dan Waktu Proyek Gedung Satnarkoba dengan Metode CPM dan PERT, Jurnal Talenta
Dudi Ahmad Fajar, Universitas Mercubuana (2025), Analisis manajemen waktu dengan metode critical path method dan program evaluation and review technique untuk menentukan durasi optimal
Ervinto, (2005), Pengertian Pemilik Proyek (Owner) dan Tujuan Penjadwalan Proyek
Ir. Irika Widiasanti, M.T., Lenggogeni, M.T. (2013) Manajemen Konstruksi, PT. Remaja Rosdakarya, Bandung
J Victory, I Indrastuti (2025), Analisis Perbandingan Perencanaan dan Pelaksanaan pada Time Schedule Pembangunan Struktur Ruko 3 Lantai dengan Metode CPM dan PERT, Studi Kasus Piayu Regency, Jurnal Teknik Sipil Cendikia
Kerzner, (2009), Langkah-Langkah Penerapan Critical Path Method
MR M Rizal, Universitas Sulawesi Barat (2025), Manajemen Penjadwalan Waktu Pada Proyek Preservasi Jalan Tomata, Kabupaten Morowali Utara dengan Metode CPM dan PERT
NF Lauriska, YP Negoro, ED Priyana (2025), Analisis Waktu Dan Biaya Proyek Sistem Sie Water Menggunakan Metode CPM dan PERT, Studi Kasus PT. Swadaya Graha, Jurnal Teknologi dan Informatika
Schwable, (2006:9), Pengertian Manajamen Proyek
Soeharto, (1999:28), Pengertian Manajamen Proyek
S Almaliya, Shafa, Universitas Mercu Buana Jakarta (2025), Analisis Penjadwalan Proyek Pembuatan Ducting Menggunakan Metode CPM dan PERT
SF Devina, Y Yuniar (2025) Evaluasi Penjadwalan Proyek Renovasi Kantor Pengurus KKB BNI Falatehan Jakarta Menggunakan Metode CPM dan PERT, Jurnal Publikasi