Abstract

The Indonesia Arena GBK Stadium in Jakarta is the first international-standard indoor stadium in Indonesia with a capacity of approximately 16,000 spectators and a roof span of 130 × 103 m. This study analyzes the quality, cost, and installation time of the space frame roof structure and provides optimization recommendations for similar projects. The results show that quality is maintained through systematic work methods, effective zoning, and continuous quality control. The implementation cost was recorded at IDR 57.57 billion with a duration of 105 days for 27 zones. Optimization is recommended through digital inspection, on-ground module prefabrication, parallel work between zones, and integrated material procurement. Space frame technology has been proven to increase installation efficiency and minimize delays, so that the project is completed on time for the 2023 FIBA World Cup.

References

Edison Hatoguan Manurung, Alip Prajoko, Oloan Sitohang, Haryanto. (April 2023):Cost and Time Analysis of Steel Roof Structure Construction Work Using Portal Frames and Portal Trusses, Volume 6, Number 1, Journal of Civil Mechanics Construction Engineering (JRKMS), Medan.

Muhammad Wafi Hariry, Yayat Hendrayana. (2023): Technical Implementation of the Installation of Space Frame Truss Roof Structures in the GGM Majalengka Development Project, Civil Engineering Journal, Faculty of Engineering, University of Majalengka, Majalengka.

Michelle Gracia Uruilal, La Mohamat Saleh, Meyke Marantika. (2024): Analysis of the Cost and Time Plan for Installing a Profile Steel Roof Frame at the Honda Sales Office, Ambon Branch, Volume 1, Number 7, Jurnal Penelitian Multidisiplin Bangsa, Ambon.

Yolanda Azhar Susanti, Dewi Rachmaniatus, Tika Novis Putri. (2024): Methods for Constructing Wide-Span Structures at the Gelora Bung Karno Aquatic Stadium, Volume 14, Number 1, Journal of Architecture, Muhammadiyah University, Aceh. Indonesia Number KEP.102/MEN/VI/2004 Overtime Working Time and Overtime Wages, Jakarta: Department of Public Works.

M. Jazir Alkas, Dharwati P. Sari, Budi Haryanto, Nabila Aulia Rahmadanri. (2024): Project Cost and Time Control Using the Result Value Analysis Method Using Microsoft Project, Volume 1, Number 7, Journal of Tropical Engineering, Technology, and Innovation, East Kalimantan.

Dinda Fardilaa, Nurr Robbyatul Adwayahb. (2021): Optimizing Project Costs and Time Construction with Overtime and Additional Labor, Volume 17, Number 01, Civil Engineering Journal, Yogyakarta.

Kacapuri Journal. (2021): Comparison of Cost Budget Plans Between the SNI 2010 Method and Work Unit Price Analysis, Volume 4, Number 2, Civil Engineering Journal, Banjarmasin.

Mulyadi Sugih Dharsono, Arya Gilang. (2023): Comparative Study of Light Steel Roof Frame Construction Methods with Conventional Methods and Prefabricated Methods, Journal of Engineering Research and Reports, 25(8), 148–156.

Sugeng Hariyadi, Hanie Teki Tjendani, Budi Witjaksana. (2024): Cost and Time Analysis Using the Earned Value Analysis Method, Eduvest – Journal of Universal Studies, 4(9), 8273–8283.

Devita Putri Maharani, Ary Setyawan, Setiono. (2024): Time and Cost Optimization Analysis of Reservoir Building Work in Wosusokas Regional SPAM Project using Time Cost Trade Off Method, Sustainable Civil Building Management and Engineering Journal, 1(4), 1–12.

Downloads

Published

2025-09-18

How to Cite

Muhamad Kamil, & Alizar, A. (2025). Analysis of the Quality, Time, and Cost Planning of the Space Frame Steel Roof Structure in the Indonesia Arena GBK Stadium Project in Jakarta. Jurnal Ilmiah Teknik, 4(3), 46–61. https://doi.org/10.56127/juit.v4i3.2284

Similar Articles

1 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.