PENJADWALAN PROYEK PEMBUATAN ROLLING MACHINE MENGGUNAKAN METODE JALUR KRITIS

Authors

  • Ratih Wulandari Universitas Gunadarma

DOI:

https://doi.org/10.56127/juit.v2i1.480

Keywords:

Rolling Machine, Critical Path, Project Schedulling

Abstract

Scheduling is very important in the basis of project planning so that it can run smoothly and can be completed on time. Before the project is carried out, it is necessary to have a project management stage which includes the planning stage, the scheduling stage and the coordination of these stages. Estimation of completion time for the production of rolling machine projects scheduled by PT. X is 36 days, the actual time in working on the rolling machine project is 32 days, then the estimated time for completing the iron rolling machine project using Microsoft Project is 27 days. The sequence of work processes using the critical path starts with number 1.1-1.2-2.1-4.1-4.2-4.3-4.7-4.8-6.1-6.2-6.3-7.1-7.2-7.3-7.4-7.5-7.6-7.7-7.8-7.9-7.10-8.1-8.2.

References

Emanuel Andi Wahju Rahardjo, 2009. Panduan Lengkap Mengelola Proyek dengan Microsoft Project Profesional 2007, Graha Ilmu, Yogyakart

Rizki dan Syahrizal. (2014). Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode PERT dan CPM. Medan: USU

Taha, Hamdy A., Operation Research: An Introduction, edisi ke-3; Macmillan Publishing Co., Inc., New York. 1982

Downloads

Published

2023-01-16

How to Cite

Ratih Wulandari. (2023). PENJADWALAN PROYEK PEMBUATAN ROLLING MACHINE MENGGUNAKAN METODE JALUR KRITIS. Jurnal Ilmiah Teknik, 2(1), 43–48. https://doi.org/10.56127/juit.v2i1.480

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.