ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF K3 IN CONSTRUCTION PROJECTS

Authors

  • Menik Ariyanti 17 Agustus 1945 Surabaya University
  • Wateno Oetomo 17 Agustus 1945 University
  • Sajiyo Sajiyo 17 Agustus 1945 University

DOI:

https://doi.org/10.56127/ijst.v3i1.1195

Abstract

Low implementation of K3 in construction projects can cause the safety and health of construction workers to be given less attention, so that construction workers feel less safe and comfortable, which can result in a decrease in performance levels. The impact of non-optimal performance results in the project being carried out not being able to meet the quality requirements that have been set. Based on data analysis from observations on the Kapas-Glendeng 8 bridge widening construction project, Bojonegoro Regency, there are inhibiting factors in implementing the occupational health and safety management system, namely workforce competency, work experience in the construction sector, job training, ability to access information via digital media. , worker involvement in making regulations, understanding and awareness in wearing PPE, reporting procedures, data recording and documentation.

References

Adi Prakoso Satria, dkk. (2022). Faktor Penghambat Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Konstruksi (Stdi Kasusu Proyek Pembangunan Rumah Sakit Universitas Muhammadiyah Surakarta). Jurusan Teknik Sipil Fakultas Teknik Unversitas Tidar. Prosiding Seminar Nasional Riset Teknologi Terapan: 2022 e-ISSN: 2747-1217.

Bagja Kurnia Muhammad. (2020). Faktor-Faktor Penyebab Rendahnya Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Perusahaan Bidang Pekerjaan Konstruksi. Jurnal Student Teknik Sipil. Edisi Volume 2 No. 2 Mei 2020 ISSN: 2686-5033.

Ekki Wibowo Dzaki dan Sajiyo. (2023). Evaluation Of the Implementation of Occupational Health And Safety Management System (Smk3) At Pt. Pelabuhan. Industrial Engineering Study Program, Faculty of Engineering Universitas 17 Agustus 1945 Surabaya, Indonesia.

Eni Dwiari Kadek. (2019). Faktor Yang Berhubungan Dengan Pelaksanaan Keselamatan dan Kesehatan Kerja Di Rumah Sakit Umum Kota Denpasar. Arc. Com. Health Desember 2019. ISSN: 2527-3620.

Pemerintah Indonesia. 2012.Peraturan Pemerintah Nomor Per/50/Men/2012 Tentang Penetapan Sistem Manajemen Keselamatan dan Kesehatan Kerja. Lembar RI Tahun 2012, Per/50/Men/2012. Jakarta: Sekretariat Negara.2012, halaman 8-22.

Wardana Putri Khurin, dkk. (2021). Analisis Faktor Penghambat Penerapan Sistem Manajemen K3 Serta Langkah Menciptakan Safety Culture Terhadap PT. Gunanusa Utama Fabricators. Departemen Teknik Kelautan Universitas Hasanuddin.Seminar Sains dan Teknologi Kelautan, Gedung CSA Kampus Fakultas Teknik UNHAS Gowa 3 November 2021.

Winalda Daniel, dkk (2018) Analisis Korelasi Faktor-Faktor Penerapan K3 Terhadap Tingkat Kecelakaan dan Tingkat Keparahan Pada Proyek Konstruksi. Jurnal Mitra Teknik Sipil. Vol. 1 No. 1: Hal 195-204.

Downloads

Published

2024-03-03

How to Cite

Ariyanti, M., Wateno Oetomo, & Sajiyo, S. (2024). ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF K3 IN CONSTRUCTION PROJECTS. International Journal Science and Technology, 3(1), 7–12. https://doi.org/10.56127/ijst.v3i1.1195

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.