Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025
DOI:
https://doi.org/10.56127/ijst.v4i3.2290Keywords:
RAB, AHSP 2024, AHSP 2025, cost estimates, construction projects, budget efficiencyAbstract
the dynamics of the building materials market and labor costs. Therefore, a constantly updated reference is needed to ensure accurate and efficient project cost estimates. One such reference is the Work Unit Price Analysis (AHSP) which is released by the government periodically. This study aims to analyze and compare the Cost Budget Plan (RAB) value for structural work on the Kampi Sunter Hotel construction project based on the Work Unit Price Analysis (AHSP) versions 2024 and 2025. The method used is a quantitative approach through cost estimation calculations using both versions of the AHSP. The results show that the total cost of structural work based on the 2024 AHSP is Rp15,384,577,550, while based on the 2025 AHSP it is Rp13,830,592,539. There is a difference of Rp1,553,985,011 or a decrease of approximately 10.1% in the 2025 AHSP. This decrease is caused by changes in the unit price of materials, one of which is the price of Ready Mix Concrete K300 which decreased from Rp1,048,722.00 (2024) to Rp931,683.00 (2025). Therefore, it is important for project planners to always update the AHSP reference used to match the applicable year to be more relevant.
References
Aditya Permadi, R. W. (2018). Construction cost estimation analysis using unit price analysis for 2013 and 2016. Jurnal Teknik Sipil, 2(1), 1–12.
An-Nur.ac.id. (2024). Project budget: A complete guide from planning, preparation, management, to effective tips & tricks. Yogyakarta: Andi.
Bambang Pilutomo, H. R. (2020). Comparison of cost budget estimation between methods. JUTEKS Scientific Journal, 5(1), 55–66.
Brando Munaiseche, T. T. (2022). Comparative analysis of the budget plan and the implementation budget for the North Sulawesi High Prosecutor’s Office apartment development project. TEKNO, 20(82), 927–935.
Ervianto, W. (2023). Construction project management (Latest ed.). Yogyakarta: Andi.
Grenfiki, Y., & Nugraha, L. L. (2023). Comparative analysis of building bill of quantities (RAB) with AHSP 2016 and AHSP 2022. Musamus Journal of Civil Engineering, 57–60.
Hanafiah, K. (2020). Construction management. Jakarta: Kencana.
Jakarta Provincial Government. (2024). Regulation of the Governor of the Special Capital Region of Jakarta Province Number 7 of 2024: Unit price standards for 2024 (pp. 1–826).
Jakarta Provincial Government. (2025). Regulation of the Governor of the Special Capital Region of Jakarta Province Number 24 of 2024: Unit price standards for 2025 (pp. 1–1450).
Directorate General of Construction Development. (2024). Circular Letter No. 68/SE/Dk/2024: Procedures for compiling cost estimates for construction work in the public works and public housing sector (pp. 1–1054).
Directorate General of Construction Development. (2025). Circular Letter No. 30/SE/Dk/2025: Procedures for compiling cost estimates for construction work in the public works and public housing sector (pp. 1–1317).
Nugroho, A. (2024). Construction project management: Project case-based learning. Yogyakarta: UGM Press.
Pranata, A. (2011). Construction project cost estimation. Yogyakarta: Andi.
Soeharto, I. (2019). Project management: From conceptual to operational (Rev. ed.). Jakarta: Erlangga.
Soemardi, B. (2018). Cost estimation and unit price of construction work. Jakarta: Erlangga.
Triyanto, R. (2021). Project management and construction cost estimation. Yogyakarta: Deepublish.
Wa Ode Sumartini, F. S. (2022). Comparative analysis of cost budget plan. UNPAL Civil Engineering Journal, 12(2), 83–91.
Wibowo, A. (2024). Project construction RAB. Semarang: Prima Agus Teknik Foundation.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Afif Budi Santoso, Ervina Yuliyanti

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.