VISUALISASI METODE PELAKSANAAN PEKERJAAN PELAT RAMP PROYEK PEMBANGUNAN GEDUNG WAREHOUSE DEPOK

Authors

  • Tati Noviati Universitas Gunadarma

DOI:

https://doi.org/10.56127/juit.v3i2.1582

Keywords:

Slab, ramp, Visualization, Implementation method

Abstract

The Project of Depok Warehouse Building Construction is located at JL. Raya Jakarta-Bogor, KM. 35, Jatijajar, Depok City, West Java, 16415. The project of Depok Warehouse Building is built on a land area of 38,000 m2, with a building area of 24,000 m2. The Depok Warehouse Building has 8 floors, consisting of 5 floors for the building area and 3 mezzanine floors used for offices. PT. Depok Logistik Properti is the owner of the project, PT. Trimatra Jasa Prakarsa as the construction management, PT. Gistama Intisemesta as the planning consultant, and PT. Total Persada Indonesia as the main contractor. The type of contract used is a lump sum with a contract value of Rp 350,000,000,000. The planned duration of the Warehouse Building Construction project is 670 days. Research made on the field include upper structure works such as column, beam, floor slab, and ramp slab. The stages of the implementation method for the ramp Truck Plate Work start from preparation, marking, reinforcement fabrication, reinforcement installation, concrete decking installation, reinforcement checklist, formwork installation, verticality test, casting, formwork removal, and concrete curing.

References

Ervianto, W.l., 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi

Ervianto, W.l., 2005. Manajemen Proyek Konstruksi. Yogyakarta: Andi

Hernandi, Y. dan Tamtana JS. 2020. Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. (online) https://journal.untar.ac.id/index.php/jmts/article/view/6985 (Diunduh 13 Mei 2023)

Kerzner, H. 2009. Project Management. A system approach to planning, schedulling, and controlling (10th ed.), New York, John Wiley & Sons.

Kusuma, F. 2020. Metode Pelaksanaan Pekerjaan Kolom Pada Proyek Gedung Kingland Avenue-Tangerang.(online)https://repository.mercubuana.ac.id/63637/ (Diunduh 10 Mei 2023)

Messah, Yunita A. "Kajian Hubungan Waste Material Konstruksi Dan Organisasi Proyek Konstruksi." Jurnal Teknik Sipil Nusa Cendana, vol. 1, no. 1, 2011, pp. 52-66. (Online) https://media.neliti.com /media/publications/141444-ID-kajian-hubungan-waste-material-konstruks.pdf (Diunduh 29 Mei 2023)

Mulki, M. M. dan Syah RMAA. 2022. Metode Pelaksanaan Pekerjaan Kolom Proyek Pembangunan Bangunan Khusus RSUD DR. M. Soewandhi. (online) http://repository.upnjatim.ac.id/11752/ (Diunduh 10 Mei 2023)

Ratri, Bernadetta Galuh Sekar. 2011. Studi Mengenai Kecerdasan Emosional dan Peranan Kepemimpinan Manajemen Proyek Konstruksi di Jakarta. S1 Thesis, UAJY. (Online) http://e-journal.uajy.ac.id/id/eprint/902 (Diunduh 29 Mei 2023)

Santoso, Budi. 2003. Manajemen Proyek. Surabaya: Guna Widya Anonim

Schwalbe, K. (2014). Information Technology Project Management. Boston, MA: Course Technology

Slamet, K. (2016). Implementasi Mata Kuliah Manajemen Proyek Dalam Bentuk Pelaksanaan Proyek. Info Artha, 4, 121-142. https://doi.org/10.31092/jia.v4i4

Setiadi, Asep. 2009. Studi Pemahaman dan Penerapan Constructability Oleh Kontraktor. S1 Thesis UAJY. (Online) http://e-journal.uajy.ac.id/id/eprint/ 3185 (Diunduh 29 Mei 2023)

Setyawan, Juari Agung. 2011. Kajian Faktor yang Dipertimbangkan Kontraktor Dalam Memilih Subkontraktor. S1 thesis, UAJY. (Online) http://e-journal.uajy.ac.id/2030/ (Diunduh 29 Mei 2023)

Sinaga, Yansen. 2014. Praktek Perencanaan dan Pengendalian Biaya Proyek pada Kontraktor di Balikpapan Kalimantan Timur. S1 Thesis, UAJY. (Online) http://e-journal.uajy.ac.id/7090/ (Diunduh 30 Mei 2023)

Suwinardi. Organisasi Proyek. Orbith, Majalah Ilmiah Pengempangan Rekayasa dan Sosial. VOL. 10 NO. 1 MARET 2014: 37 – 42 (Online) https:/ /jurnal.polines.ac.id/index.php/orbith/article/view/ 360/315 (Diunduh 29 Mei 2023)

Terry, George, R. 2003. Prinsip-Prinsip Manajemen (alih bahasa J. Smith D. F.M). Bumi Akasara; Jakarta.

Downloads

Published

2024-05-08

How to Cite

Tati Noviati. (2024). VISUALISASI METODE PELAKSANAAN PEKERJAAN PELAT RAMP PROYEK PEMBANGUNAN GEDUNG WAREHOUSE DEPOK. Jurnal Ilmiah Teknik, 3(2), 126–133. https://doi.org/10.56127/juit.v3i2.1582

Similar Articles

1 2 3 4 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.