ANALISIS PELAKSANAAN DAN PERHITUNGAN KEBUTUHAN BETON PEKERJAAN KOLOM PADA PROYEK X CIBUBUR

Authors

  • Andi Asnur Pranata M. H Universitas Gunadarma
  • Uppit Yuliani Universitas Gunadarma
  • Ellysa Ellysa Universitas Gunadarma
  • Hermawan Tri Pambudi Universitas Gunadarma

DOI:

https://doi.org/10.56127/juit.v3i2.1434

Keywords:

Implementation Method, Column Work, Concrete Demand

Abstract

The development of Project X Cibubur is located on Alternatif Cibubur Street, West Java. The project, which is built on a land area of ± 40100 m2, is a superblock in one area where there are malls, hotels, and apartments. The purpose of this research is to analyze and calculate the concrete demand for column work in Project X Cibubur. The type or form of column used in this project is square with several types of columns. The method of implementation carried out in column work includes preparation, measurement of axles, fabrication of reinforcement and formwork, transportation, installation, inspection, casting, dismantling formwork and maintenance. After calculating the volume of concrete requirements for column work, the total volume of concrete requirements for type K3A is 76.649 m3, K4A is 50.808 m3, K4B is 3.368 m3, and K4C is 3.334 m3. The total volume of concrete demand in column work is 134,159 m3.

References

Anonim. (2014). Kolom Bangunan Pengertian, Jenis, dan Fungsinya. [online] https : // dpupkp. bantulkab. go. id/ berita/ 96- kolom- bangunan-pengertian – jenis – dan fungsinya [diakses tanggal 25 April 2019].

Badan Standarisasi Nasional. (2002). SNI 03-2847-2002 Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung. Bandung: Badan Standarisasi Nasional.

Badan Standarisasi Nasional. (2002). SNI 03-2847-2002 Kait Standar untuk Sengkang (Begel). Bandung: Badan Standarisasi Nasional.

Badan Standarisasi Nasional. (2013). SNI 03-2847-2013 Persyaratan Beton Struktural untuk Bangunan Gedung. Bandung: Badan Standarisasi Nasional.

Nawi, Edward G. (1998). Beton Bertulang, Suatu Pendekatan Dasar. Bandung: PT.Refika Aditama.

Slamet. (2012). Beton Decking dan Fungsinya. [online] https: //projectmedias .blogspot. com/2014/01/beton-decking-dan-fungsinya. html [diakses tanggal 15 Mei 2019].

Soeharto, Iman. (1997). Perenacanaan Proyek. Erlangga, Jakarta.

Sudarmoko. (1996). Pengertian Kolom. Erlangga, Jakarta.

Wikipedia. (2017). Kolom [online] http://id.wikipedia.org/wiki/Kolom, [diakses tanggal 15 Mei 2019].

Downloads

Published

2024-05-08

How to Cite

Andi Asnur Pranata M. H, Uppit Yuliani, Ellysa Ellysa, & Hermawan Tri Pambudi. (2024). ANALISIS PELAKSANAAN DAN PERHITUNGAN KEBUTUHAN BETON PEKERJAAN KOLOM PADA PROYEK X CIBUBUR. Jurnal Ilmiah Teknik, 3(2), 82–91. https://doi.org/10.56127/juit.v3i2.1434

Similar Articles

1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.