Analysis of the Productivity of Excavator and Dump Truck Heavy Equipment in the Excavation Works for the Construction of Jakarta MRT Station Cp 203 Phase 2A
DOI:
https://doi.org/10.56127/ijst.v4i1.2235Keywords:
Productivity, Excavator, Dump Truck, Cycle Time, Jakarta MRT ProjectAbstract
The increasing demand for transportation infrastructure in urban areas such as Jakarta has led to the implementation of the Jakarta Mass Rapid Transit (MRT) Phase 2A project. One of the key components in this project is the efficiency of heavy equipment usage, particularly excavators and dump trucks, in excavation work. This study aims to analyze the productivity of excavators and dump trucks, calculate production per cycle, hourly production, daily production, and determine the optimal number of equipment units required to meet project completion targets.
The research method uses a quantitative approach by collecting primary data through field observations and interviews, as well as secondary data from project documents. The analysis results show that the Caterpillar 320 excavator has an actual productivity of 40.8 m³/hour, while theoretical calculations indicate a productivity potential of up to 45.8 m³/hour. To support the optimal operation of the excavator, four dump trucks with a capacity of 24 m³ are required. This study provides recommendations for efficient allocation of heavy equipment to optimize project duration and cost. This research is expected to serve as a technical reference for future infrastructure projects in planning heavy equipment requirements effectively.
References
concepts for owners, engineers, architects, and builders. Prentice-Hall.
PUPR Ministerial Regulation No. 8 of 2023. (2023). Regulation of the Minister of Public Works and Public Housing Number 8 of 2023 concerning Guidelines for Compilation.
Rohman, M. (2018). Analysis of Productivity of Heavy Equipment Use in Earthworks and Foundations in the Construction Project of Research Laboratory Building (GMP and GLP) Biosciences, Brawijaya University, Malang. Doctoral Dissertation, ITN Malang.
Rostiyanti, SF (2008). Heavy Equipment for Construction Projects Second Edition. Jakarta: PT. Rineka Cipta.
Saefudin, AH (2016). Study of the Use of Heavy Equipment in Highway Construction Projects Reviewed from Technical and Economic Aspects {Case Study of the BOCIMI (Bogor, Ciawi, Sukabumi) Toll Road Construction Project}. Online Journal of Civil Engineering Students (JOM), 1(1). https://jom.unpak.ac.id/index.php/tekniksipil/article/view/473
Soeharto, I. (1999). Project Management (From Conceptual to Operational) Second Edition. Jakarta: Erlangga.
Sugiyono. (2019). Quantitative, Qualitative, and R&D Research Methods. Bandung: Alfabeta.
Wilopo, D. (2009). Construction Methods and Heavy Equipment. Jakarta: University of Indonesia.
Yamin, R. (2010). Archeology In The Bringhurst Yard: 5448 Germantown Avenue. Germantown Crier, 60(2).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Renaldy Rudiyansa, Era Agita Kabdiyono

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.