Analysis of Factors Influencing Contractor Profit and Loss in Construction Projects: A Case Study of the Boemi Oemmi Luxury Kost Garut Development

Authors

  • Siti Patimah Adawiah Universitas Dian Nusantara, Indonesia
  • Era Agita Kabdiyono Universitas Dian Nusantara, Indonesia

DOI:

https://doi.org/10.56127/juit.v5i1.1800

Keywords:

Construction Project Management, Contractor Profitability, Project Management Factors, Construction Risk Management, Relative Importance Index

Abstract

Construction projects often face financial challenges that can lead to contractor profits or losses during project implementation. Factors such as labor productivity, material availability, equipment management, financial conditions, and field conditions may significantly affect contractor financial performance. Therefore, identifying these factors is important to improve project management and reduce financial risks. Objective: This study aims to analyze the factors influencing contractor profits and losses in the Boemi Oemmi Luxury Kost Garut construction project and to identify the most dominant factors as well as the actions implemented to address these factors. Method: This research employed a quantitative descriptive approach. Data were collected through questionnaires distributed to respondents involved in the construction project, including contractors, consultants, and project owners. The sampling technique used was purposive sampling. The collected data were analyzed using descriptive statistical methods, including mean value analysis and the Relative Importance Index, to determine the ranking of factors influencing contractor profits and losses. Findings: The results show that labor factors are the most dominant factor influencing contractor profits and losses in the Boemi Oemmi Luxury Kost Garut development project, while equipment factors have the lowest influence. In terms of the implementation of actions to address these factors, material-related issues were found to be the most highly applied factor, whereas weather-related factors were the least applied. Implications: The findings of this study provide practical implications for construction project stakeholders by emphasizing the importance of improving workforce productivity, strengthening material procurement planning, and enhancing project management strategies to minimize financial risks and improve contractor profitability. Originality: The originality of this study lies in its empirical analysis of contractor profit and loss factors within a specific construction project context using a structured ranking approach through the Relative Importance Index, which provides a systematic evaluation of factors influencing contractor financial performance.

References

Aneesha, K., & Haridharan, M. K. (2017). Ranking the Project Management Success Factors for Construction Project in South India. IOP Conference Series: Earth and Environmental Science,

Aragaw, B. T., & Cherkos, F. D. (2025). Integrating Key Elements for Smooth Project Execution: Unveiling the Interplay of Critical Success Factors in High-Rise Construction [Article]. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 17(2), Article 04525001. https://doi.org/10.1061/JLADAH.LADR-1152

Asamoah, R. O., Baiden, B. K., Nani, G., & Kissi, E. (2022). Identifying intangible resources to enhance profitability strategies of Small-Medium Scale Construction Firms (SMSCFs) in developing countries [Article]. International Journal of Construction Management, 22(11), 2207-2214. https://doi.org/10.1080/15623599.2020.1774835

Badan Pusat Statistik, B. (2025). Indikator Konstruksi, Triwulan IV-2024 [Report](1979-8024). https://www.bps.go.id/id/publication/2025/03/27/9bae1d4a4dd0b3cd7fb31ffd/indikator-konstruksi--triwulan-iv-2024.html

Borges, D. B., Soares, C. A. P., Najjar, M., Costa, B. B. F. D., Tam, V. W. Y., & Haddad, A. N. (2025). Project success and critical success factors of construction projects from the perspective of a multicultural team: a case study in Guyana [Article]. International Journal of Construction Management, 25(10), 1115-1129. https://doi.org/10.1080/15623599.2024.2397626

Buhamizo, I., Muhwezi, L., & Sengonzi, R. (2023). A Regression Model to Enhance the Profitability of Local Construction Contractors in Uganda [Article]. Journal of Construction in Developing Countries, 28(1), 221-241. https://doi.org/10.21315/jcdc-08-21-0137

Gudiene, N., Banaitis, A., & Banaitiene, N. (2013). Evaluation of critical success factors for construction projects - an empirical study in Lithuania [Review]. International Journal of Strategic Property Management, 17(1), 21-31. https://doi.org/10.3846/1648715X.2013.787128

Hanafi, M. H., Abdullah, S., Hasan, R., & Ahmad, H. (2023). The critical success factors for building materials availability at construction sites: A qualitative approach. AIP Conference Proceedings,

Herath, S., & Chong, S. C. (2021). Key components and critical success factors for project management success: A literature review [Review]. Operations and Supply Chain Management, 14(4), 431-443. https://doi.org/10.31387/oscm0470314

Herawati, E., Suparjo, & Lestarii, R. (2022). Housing Regulations for Low-Income People in Indonesia. International Journal of Environmental, Sustainability, and Social Sciences.

Jung, M., You, S., Chi, S., Yu, I., & Hwang, B. G. (2018). The relationship between unbilled accounts receivable and financial performance of construction contractors [Article]. Sustainability (Switzerland), 10(8), Article 2679. https://doi.org/10.3390/su10082679

Kanan, M. (2020). Lessons learned from a delayed medical construction project [Article]. International Journal of Scientific and Technology Research, 9(4), 2565-2569. https://www.scopus.com/inward/record.uri?eid=2-s2.0-85083427805&partnerID=40&md5=022fdde153a35081bae29bd27481eaa8

Kim, J., & Bilbao, P. (2023). Why Are the Frequently Reported Delay Factors in Construction Projects Recurring?: A Qualitative Study [Article]. International Journal of Sustainable Construction Engineering and Technology, 14(1), 21-31. https://doi.org/10.30880/ijscet.2023.14.01.003

Koirala, M. P., & Shahi, R. S. (2024). Examining the causes and effects of time overruns in construction projects promoted by rural municipalities in Nepal [Article]. Evaluation and Program Planning, 105, Article 102436. https://doi.org/10.1016/j.evalprogplan.2024.102436

Lenong, A. (2026). Understanding the Formation of Boarding House Rent Prices: Researching the Perspectives of Owners and Tenants Around the Campus of Universitas Kristen Indonesia Paulus. Edunomika.

Maghsoodi, A. I., & Khalilzadeh, M. (2018). Identification and Evaluation of Construction Projects’ Critical Success Factors Employing Fuzzy-TOPSIS Approach [Article]. KSCE Journal of Civil Engineering, 22(5), 1593-1605. https://doi.org/10.1007/s12205-017-1970-2

Nadeem, M., Jiskani, I. M., Urwat, M. S., Uddin, S., Akhtar, K., & Khokhar, N. H. (2023). Analysing delay factors in construction projects using Z-number approach: insights from Pakistan [Article]. Canadian Journal of Civil Engineering, 50(12), 966-983. https://doi.org/10.1139/cjce-2022-0310

Nguyen, V. S., Nguyen, H. H., Nguyen, D. A., & Hai, D. T. (2023). Delay factors in the construction of irrigation and hydropower projects in Vietnam [Article]. Archives of Civil Engineering, 69(1), 5-20. https://doi.org/10.24425/ace.2023.144156

Oleah, C., Afolabi, A. O., Osoaku, F., & Ochiba, D. (2022). Impediments to Contractors' Profitability in Building Projects. AIP Conference Proceedings,

Susanti, R., Fauziyah, S., & Suwarto, F. (2021). Assessing factors towards construction project delays in Indonesia. IOP Conference Series: Earth and Environmental Science,

Tahmasebinia, F., & Song, V. (2022). Significant Factors Causing Delay in the Cambodian Construction Industry [Article]. Sustainability (Switzerland), 14(6), Article 3521. https://doi.org/10.3390/su14063521

Tamer, Z., Yoon, Y., & Hastak, M. (2012). Protocol for profitability analysis using internal entities in organizational structure of construction companies [Article]. Journal of Construction Engineering and Management, 138(12), 1394-1402. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000563

Yaqub, A., Anam, M., Umar, M., Abdullah, M., & Alam, M. (2026). Analyzing Causes of Delays in Highway Construction Projects: A Case Study of Pakistan [Article]. Transportation Research Record, 2680(2), 877-890. https://doi.org/10.1177/03611981251368319

Zahoor, M. H., & Ali, M. (2023). Assessment of Critical Success Factors for Building Projects through the Literature † [Article]. Engineering Proceedings, 53(1), Article 45. https://doi.org/10.3390/IOCBD2023-15988

Downloads

Published

2026-02-28

How to Cite

Adawiah, S. P., & Kabdiyono, E. A. (2026). Analysis of Factors Influencing Contractor Profit and Loss in Construction Projects: A Case Study of the Boemi Oemmi Luxury Kost Garut Development. Jurnal Ilmiah Teknik, 5(1), 287–305. https://doi.org/10.56127/juit.v5i1.1800

Citation Check

Similar Articles

<< < 1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.