Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project
DOI:
https://doi.org/10.56127/juit.v4i2.2237Keywords:
SUTT Tower Relocation, Ancol–Pluit Toll Road, Cost Analysis, Project Scheduling, CPM, PERT, AHSP.Abstract
The construction of the Ancol Timur – Pluit Toll Road as part of a national strategic project in Jakarta faces technical challenges in the form of the presence of High Voltage Transmission Towers (SUTT) that interfere with the construction route. This study aims to analyze the cost and time required to elevate and relocate the SUTT towers, as well as evaluate their efficiency in terms of project management. The study employs cost analysis methods using the BOW, SNI, and AHSP approaches, along with scheduling techniques such as Bar Chart, CPM, and PERT. The results indicate relatively close cost estimates across methods but variations in implementation duration among scheduling methods. Project efficiency is determined by the accuracy of estimates, inter-sectoral coordination, and the utilization of construction technology. These findings are expected to provide practical contributions to the implementation of similar infrastructure projects and serve as an academic reference in construction management.
References
Affandy, A. (2022). Analysis of the application of time management in the measurement project of the Peranap-Pekanbaru Riau Sutet transmission line [Thesis, Medan Area University].
Ahmed, U., & Saqib, M. A. (2020). Prospect of voltage uprating of a conservatively designed EHV transmission line. Electric Power Systems Research, 182, 106203. https://doi.org/10.1016/j.epsr.2020.106203
Analysis of Wages and Materials (BOW Analysis). (1993). Analysis of wages and materials (BOW Analysis). Jakarta: Bumi Akasra.
Arianto, A. (2010). Eksplorasi metode Bar Chart, CPM, PDM, PERT, Line of Balance dan Time Chainage Diagram dalam penjadwalan proyek konstruksi. Semarang.
Astari, N. M., et al. (2021). Project management planning with CPM and PERT methods. Journal of Construction, 13(1), 164-180.
Buih, D. K., et al. (2020). Analysis of labor productivity costs in interior projects with AHSP 2022. Journal of Civil Engineering Engineering, 1(1), 43-49.
Devina, S. F., & Yuniar. (2025). Evaluation of the scheduling of the renovation project of the KKB BNI Falatehan Jakarta management office using the CPM-PERT method. National Seminar on Assessment and Application of Science and Technology 2025, TI016, 1-9.
IEEE. (2016). IEEE guide to the installation of overhead transmission line conductors (IEEE Standard 524-2016).
Indra, P., et al. (2023). Comparison using SNI and BOW method analysis of cost budget plan and implementation in concrete work. Journal of Science, Engineering and Information Systems Research, 1(3), 133-141.
Ines, H., & Ammar, F. B. (2020). Multi-criteria decision making for reconductoring overhead lines. In Proceedings of the 17th International Multi-Conference on
Systems, Signals and Devices (SSD 2020) (pp. 53–58). IEEE. https://doi.org/10.1109/SSD49366.2020.9364080
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling. Wiley.
Khandare, D. P., & M. R. N. (2021). Prepare project schedule using Microsoft Project. International Journal of Research Publication and Reviews, 2(8), 233–245.
Kishore, T. S., & Singal, S. K. (2014). Optimal economic planning of power transmission lines: A review. Renewable and Sustainable Energy Reviews, 39, 949–974. https://doi.org/10.1016/j.rser.2014.07.125
Kopsidas, K., & Rowland, S. M. (2009). A performance analysis of reconductoring an overhead line structure. IEEE Transactions on Power Delivery, 24(4), 2248–2256. https://doi.org/10.1109/TPWRD.2009.2021042
Mahendra, P. I., & Tjendani, H. T. (2023). Cost and time calculation analysis of redesigning foundation work on Tower 2 ITS. Taguchi Journal, 3(2), 1474-1480.
Mawardi, E. (2023). Analysis of cost budget comparison using BOW, SNI, and AHSP methods. Teslink Journal, 5(1), 48-60.
Mbuli, N., et al. (2019). A literature review on capacity uprate of transmission lines: 2008 to 2018. Electric Power Systems Research, 170, 215–221. https://doi.org/10.1016/j.epsr.2019.01.006
Ministry of PUPR. (2012). Guidelines for analyzing the unit price of work (AHSP) in the field of public works. Jakarta.
Nasution, A. Z. (2015). Infrastructure project management. Graha Ilmu.
Nibenia, E. (2024). Analysis of structural work with unit price analysis methods of BOW, SNI, and AHSP (case study) [Thesis, HKBP Nommensen University Medan].
PLN. (2020). Technical guidelines for the construction and maintenance of transmission networks. PT PLN (Persero).
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) – 7th edition.
PT PLN (Persero) Load Control Center Main Unit. (2019). Feasibility study of the Cibatu Baru II/Sukatani 500 kV GITET construction project and related outlets (1st Revision) (No. 23.03/2019.10/132). Depok.
Rachmansyam, A. (2022). Cost analysis of labor productivity in interior projects with AHSP 2022 [Thesis, Nusa Putra University].
Rashmi, Shivashankar, G. S., & Poornima. (2017). Overview of different overhead transmission line conductors. Materials Today: Proceedings, 4(9), 11318–11324. https://doi.org/10.1016/j.matpr.2017.09.057
Reddy, B. S., & Chatterjee, D. (2016). Analysis of high temperature low sag conductors used for high voltage transmission. Energy Procedia, 90, 179–184. https://doi.org/10.1016/j.egypro.2016.11.183
Reed, L., et al. (2020). Expanding transmission capacity: Examples of regulatory paths for five alternative strategies. Electricity Journal, 33(6), 106770. https://doi.org/10.1016/j.tej.2020.106770
Riba, J. R., et al. (2020). Uprating of transmission lines by means of HTLS conductors for a sustainable growth: Challenges, opportunities, and research needs. Renewable and Sustainable Energy Reviews, 110334. https://doi.org/10.1016/j.rser.2020.110334
Siregar, R. (2019). Construction cost management. Erlangga.
Vadivel, K. K. (2017). Emergency restoration of high voltage transmission lines. The Open Civil Engineering Journal, 11(1), 778–785.
Wale, P. M. (2015). Planning and scheduling of project using Microsoft Project: Case study of a building in India. IOSR Journal of Mechanical and Civil Engineering, 12(3), 56–63.