MINOR FACTORS IN WORK ELEMENTS OF SMK3 IMPLEMENTATION OF PCI GIRDER ERECTION WORK BASED ON PP NO 50 OF 2012
DOI:
https://doi.org/10.56127/ijst.v2i3.1118Keywords:
Analysis, Implementation of SMK3, RegulationAbstract
Proving that the implementation of the Occupational Safety and Health Management System (SMK3) can be a reference that regulates various activities therein, as well as managing K3 systematically and comprehensively in a complete management system as an effort to prevent work accidents. The SMK3 assessment on the Probolinggo Banyuwangi Toll Road Development Project Package 1 aims to find out how much level of SMK3 implementation is being implemented, what factors influence the fulfillment of SMK3 implementation and then provide a response as an effort to take corrective action/improvement. Based on the results of the audit and analysis consisting of 166 criteria (Advanced Level) assessment as stated in Government Regulation No. 50 of 2012 concerning SMK3, it is known that the number of criteria fulfilled/appropriate is 149 criteria with an application percentage value of 89.76% and there are 17 The criteria are not met/not appropriate, namely with a percentage value of 10.24% (Minor Category). These results are included in the implementation assessment level category (Satisfactory). The implementation of SMK3 in the Probolinggo Banyuwangi Package 1 Toll Road Construction project is in accordance with and refers to applicable laws and regulations.
References
Sajiyo (2022) JSpTS Vol 3 No 1 (2022) Analisa Resiko dan Pengaruhnya terhadap Pelaksanaan Proyek Kontruksi Perumahan Griya Pesona Indah Kota Kediri
Sajiyo (2023) ISSN Vol 12 no 03 Evaluasi Penerapan Sistem Manajemen Kesehatan dan Keselamatan kerja PT. Pelabuhan
Broto, I. K. (2011). Identifikasi dan Penanganan Risiko K3 Pada Proyek Konstruksi Gedung. Poli Teknologi Vol. 10, No.1, 83-92.
Febyana Pangkey, G. Y. (2012). Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Proyek Konstruksi di Indonesia. Jurnal Ilmiah MEDIA ENGINEERING Vol. 2, No. 2, 100-113.
Hakim, A. R. (2017). Implementasi Manajemen Risiko Sistem Kesehatan, Keselamatan Kerja dan Lingkungan (K3l) pada Pembangunan Flyover Pegangsaan 2 Kelapa Gading Jakarta Utara. Media Komunikasi Teknik Sipil, Vol 23, 113-123.
Hariyono, F. S. (2017). Analisis Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Sahid Jogja Lifestyle City di Kabupaten Sleman.384-388.
ILO, I. L. (2013). Keselamatan dan Kesehatan Keja di Lingkungan Kerja. Jakarta: International Labour Office.
Parampara, B. (2018, April). Media Komunikasi BPSDM Kementrian PUPR Edisi 08. Safety COnstruction: Komitmen dan Konsistensi Terapkan SMK3, hal. 1-35.
Ramli, S. (2010). Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS18001. Jakarta: Dian Rakyat.
Sanjaya, et al. (2012). Analisis Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Gedung di Kabupaten Klungkung dan Karanggasem. Jurna Ilmiah Elektronik Infrastruktur Teknik Sipil , VIII1- VIII9