Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025

Authors

  • Afif Budi Santoso Dian Nusantara University
  • Ervina Yuliyanti Dian Nusantara University

DOI:

https://doi.org/10.56127/ijst.v4i3.2290

Keywords:

RAB, AHSP 2024, AHSP 2025, cost estimates, construction projects, budget efficiency

Abstract

the dynamics of the building  materials market and labor costs. Therefore, a constantly updated  reference is needed to ensure accurate and efficient project cost  estimates. One such reference is the Work Unit Price Analysis  (AHSP) which is released by the government periodically. This  study aims to analyze and compare the Cost Budget Plan (RAB)  value for structural work on the Kampi Sunter Hotel construction  project based on the Work Unit Price Analysis (AHSP) versions  2024 and 2025. The method used is a quantitative approach  through cost estimation calculations using both versions of the  AHSP. The results show that the total cost of structural work  based on the 2024 AHSP is Rp15,384,577,550, while based on the  2025 AHSP it is Rp13,830,592,539. There is a difference of  Rp1,553,985,011 or a decrease of approximately 10.1% in the  2025 AHSP. This decrease is caused by changes in the unit price  of materials, one of which is the price of Ready Mix Concrete  K300 which decreased from Rp1,048,722.00 (2024) to  Rp931,683.00 (2025). Therefore, it is important for project  planners to always update the AHSP reference used to match the  applicable year to be more relevant.

References

Aditya Permadi, R. W. (2018). Construction cost estimation analysis using unit price analysis for 2013 and 2016. Jurnal Teknik Sipil, 2(1), 1–12.

An-Nur.ac.id. (2024). Project budget: A complete guide from planning, preparation, management, to effective tips & tricks. Yogyakarta: Andi.

Bambang Pilutomo, H. R. (2020). Comparison of cost budget estimation between methods. JUTEKS Scientific Journal, 5(1), 55–66.

Brando Munaiseche, T. T. (2022). Comparative analysis of the budget plan and the implementation budget for the North Sulawesi High Prosecutor’s Office apartment development project. TEKNO, 20(82), 927–935.

Ervianto, W. (2023). Construction project management (Latest ed.). Yogyakarta: Andi.

Grenfiki, Y., & Nugraha, L. L. (2023). Comparative analysis of building bill of quantities (RAB) with AHSP 2016 and AHSP 2022. Musamus Journal of Civil Engineering, 57–60.

Hanafiah, K. (2020). Construction management. Jakarta: Kencana.

Jakarta Provincial Government. (2024). Regulation of the Governor of the Special Capital Region of Jakarta Province Number 7 of 2024: Unit price standards for 2024 (pp. 1–826).

Jakarta Provincial Government. (2025). Regulation of the Governor of the Special Capital Region of Jakarta Province Number 24 of 2024: Unit price standards for 2025 (pp. 1–1450).

Directorate General of Construction Development. (2024). Circular Letter No. 68/SE/Dk/2024: Procedures for compiling cost estimates for construction work in the public works and public housing sector (pp. 1–1054).

Directorate General of Construction Development. (2025). Circular Letter No. 30/SE/Dk/2025: Procedures for compiling cost estimates for construction work in the public works and public housing sector (pp. 1–1317).

Nugroho, A. (2024). Construction project management: Project case-based learning. Yogyakarta: UGM Press.

Pranata, A. (2011). Construction project cost estimation. Yogyakarta: Andi.

Soeharto, I. (2019). Project management: From conceptual to operational (Rev. ed.). Jakarta: Erlangga.

Soemardi, B. (2018). Cost estimation and unit price of construction work. Jakarta: Erlangga.

Triyanto, R. (2021). Project management and construction cost estimation. Yogyakarta: Deepublish.

Wa Ode Sumartini, F. S. (2022). Comparative analysis of cost budget plan. UNPAL Civil Engineering Journal, 12(2), 83–91.

Wibowo, A. (2024). Project construction RAB. Semarang: Prima Agus Teknik Foundation.

Downloads

Published

2025-10-08

How to Cite

Afif Budi Santoso, & Yuliyanti, E. (2025). Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 . International Journal Science and Technology, 4(3), 01–12. https://doi.org/10.56127/ijst.v4i3.2290

Similar Articles

1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.